Road & highway crossings
Trenchless pipeline installation beneath live carriageways to ADM standards, with traffic flowing above throughout.
Abu Dhabi, United Arab Emirates
Crossroad Drilling LLC is a UAE based HDD specialist. Trenchless pipeline crossings beneath live roads, utilities and sea channels, steered by ParaTrack gyro precision.
How HDD works
Scroll to drill. This is how every Crossroad bore goes in: beneath the asphalt, the utilities and the water, without a single open trench.
A steerable drill head enters at a shallow angle and tracks a pre-engineered curve beneath the obstacle, guided in real time by ParaTrack gyro and walkover locating.
The pilot hole is enlarged in staged passes with reamers matched to the soil strata, conditioned with engineered drilling fluid from our mixing plants.
The welded, tested pipe string is pulled back through the reamed bore in one continuous, controlled operation.
The pipeline exits exactly where the design says it should. Traffic above never stopped. That is the Crossroad standard.
About the company
Crossroad Drilling LLC is a UAE based HDD sub-contractor specializing in laying pipelines, from mini, midi and maxi rig crossings to long, large-diameter bores and sea channel crossings, all steered with advanced HDD technology.
More about CrossroadCapabilities
Trenchless pipeline installation beneath live carriageways to ADM standards, with traffic flowing above throughout.
Long, large-diameter bores beneath marine channels and waterways, engineered for pressure, buoyancy and strata.
Prime Horizontal ParaTrack 2 gyro guidance for survey-grade accuracy on long crossings where walkover locating cannot reach.
FREE HDD TOOLKIT
Interactive engineering tools built by our drilling team: design a bore profile, size the rig, check pipe bend radius and estimate drilling fluid, right in your browser.
Open the toolsTrusted by
Insights
HDD Basics
HDD installs pipelines beneath live roads, utilities and waterways without a single open trench. Here is how the method works and why it has become the default for UAE infrastructure.
READ THE LOG →
Engineering
Every successful crossing follows the same disciplined sequence. Understanding the three stages explains most of what happens on an HDD site, and most of what can go wrong when they are rushed.
READ THE LOG →
Marine Crossings
Marine crossings are the deep end of trenchless engineering. Pressure, buoyancy and unknown strata all conspire against the bore. Here is how long water crossings are designed to succeed.