Herrenknecht HK 250T
Maxi rig, 250 ton pullbackOur heavyweight for long, large-diameter and sea channel crossings.
CAPABILITY 02 / 06 · Sea channel crossings
Long, large-diameter HDD crossings under marine channels, creeks, lagoons and intake corridors, engineered for buoyancy, pressure and the strata beneath the seabed.
THE SCOPE
Crossing water is where HDD earns its reputation. There is no cofferdam, no dredging and no disturbance to navigation or the marine environment: the bore passes well below the channel bed and the pipeline surfaces on dry land on the far side. Crossroad has delivered marine-adjacent crossings at Al Hudayriat, Taweelah and across Abu Dhabi's island waterways for water, power and process pipelines.
These are maxi rig jobs. The Herrenknecht HK 250T provides the pullback for long strings and large diameters, the ParaTrack 2 gyro module steers the pilot bore where walkover locating cannot reach across open water, and the drilling fluid programme is engineered for the caprock, marine sands and clays typical of the Gulf coast. Buoyancy control, ballasting and the pull-section layout are planned with the pipeline contractor so the string goes in once and goes in clean.
WHAT WE DELIVER
HOW IT RUNS
Boreholes along the alignment, a strata model, and a bore profile with depth below the channel bed set for hydrofracture safety.
The HK 250T drives a gyro-steered pilot beneath the channel; position is confirmed by ParaTrack with no surface access needed.
Multiple reaming passes with fluid returns managed on both banks and recycled through the mixing plant.
The tested string is ballasted to neutral buoyancy and pulled back under continuous load monitoring.
See the full four-stage bore animated on the home page, or size your own crossing with the HDD tools.
IRON ON THE JOB

Our heavyweight for long, large-diameter and sea channel crossings.

Gyro steering for survey-grade accuracy where surface access is impossible.

Engineered mud programs matched to UAE soil strata.
ON RECORD
STRAIGHT ANSWERS
Engineers answer every enquiry. If your question is not here, send it over.
Deep enough to keep annular pressure well below the formation fracture limit at every point of the profile, which in Gulf conditions usually means 10 to 25 m below the channel bed. Depth is fixed by the geotechnical model, not by a rule of thumb.
Yes. The ParaTrack 2 gyro module measures the drill head azimuth and inclination without any surface reference, so the pilot bore can be steered on long crossings where no walkover locator could follow. Exit accuracy is within a metre on crossings of several hundred metres.
The seabed is never touched. There is no dredging, no turbidity and no interruption to vessel movement. Drilling fluid returns are contained at the entry and exit pits and recycled.
READY WHEN YOU ARE
Send the location, length and pipe spec. You will hear back from an engineer, not a call centre.